Retail construction
and store build-outs in
San Diego.

Kaminskiy Commercial Construction is a retail construction contractor in San Diego County. We build and remodel stores: storefronts, sales floors, fitting rooms, cash wraps and stockrooms. We work to the landlord's design criteria and to your opening date, with the drawings, the permit and the construction on one contract.

Retail construction

A store is built backward from its opening date.

The merchandise is ordered, the staff is hired and the advertising is booked against one day. Every decision in a retail build-out is judged by whether it protects that day.

In a leased space the build-out is a tenant improvement, and the lease decides who pays for what.

From the street inward

A store, from the sidewalk to the back door.

Six parts, each with its own job and its own rules.

  1. 01

    Storefront

    Glass, doors and the sign band. In a shopping center the landlord's criteria decide most of it.

  2. 02

    Entry

    A level, accessible way in, the right door hardware, and a floor that copes with weather and traffic.

  3. 03

    Sales floor

    Lighting first. Then backing in the walls for fixtures, power where the displays need it, and a ceiling that suits the brand.

  4. 04

    Fitting rooms

    Sized and equipped so at least one is accessible, with lighting people actually like.

  5. 05

    Cash wrap

    Power, data and a counter with a section low enough for every customer.

  6. 06

    Stockroom

    Shelving, a receiving door, and a route to the exit that stays clear.

Who signs off

Four approvals for one store.

A store answers to more than the building department. The order they are asked in matters.

  1. 01

    The landlord

    The lease and the center's design criteria govern the storefront, the finishes visible from outside, the working hours and the contractor's insurance. The landlord approves the drawings.

  2. 02

    The city

    The building permit, with the accessibility and energy rules that come with it.

  3. 03

    The brand

    A franchise or a chain adds its own standards: the prototype, the approved fixtures and sometimes the approved suppliers.

  4. 04

    The sign

    Signs are usually permitted separately, and they follow the landlord's sign program as well as the city's rules.

The calendar

What decides the opening date.

Construction is only one of the things between a signed lease and an open door.

What moves the budget is on the tenant improvement page. What drives the cost.

  • When the space is handed over

    The schedule starts the day the landlord delivers the space, in the condition the lease describes.

  • Glass and doors

    Storefront glass and doors are made to order. They are measured and ordered early.

  • Fixtures

    Display fixtures arrive from the brand or a fixture maker. The walls and the power have to be ready for them.

  • Inspections

    Final inspections have to pass before stock can come in.

  • Stocking and training

    The time between the last inspection and opening day belongs to the store team. It has to be left in the plan.

Questions

Retail construction questions.

Whose approval comes first, the landlord's or the city's?

Usually the landlord's. Most retail leases require the landlord to approve the drawings before they go to the city, and shopping centers have written design criteria for storefronts, signs and finishes. Building that review into the schedule avoids drawing the store twice.

Can a store be built from a brand's prototype drawings?

A prototype is the starting point. It has to be adapted to the actual space and to California's codes, including accessibility and energy rules, before it can be permitted. Construction then follows the adapted set.

Does the sign need its own permit?

In most cities, yes. Signs are permitted separately from the build-out, and in a shopping center they also have to follow the landlord's sign program.

What do you need from us to price a store build-out?

The lease and the landlord's design criteria, any prototype or concept drawings, the fixture plan, and the opening date. Then we walk the space with you.

Start here

Request a site walk in San Diego County.

Tell us about the space. We will call to set a time to walk it with you.

Office12396 World Trade Dr, Suite 106A
San Diego, CA 92128

Phone(858) 371-3839

HoursMonday to Friday, 8:00 AM to 4:30 PM

By providing your number and clicking “Request a site walk”, you agree to be contacted by Kaminskiy Commercial Construction about your project via phone, email, and text messages, including marketing messages about special offers, discounts, and promotions. Consent is not a condition of purchase. Message and data rates may apply. You can unsubscribe at any time by replying STOP. For help, reply HELP. Message frequency will vary.