Preconstruction
services in
San Diego.
Preconstruction is the work done before construction starts: walking the space, pricing it, drawing it and getting the permit. Kaminskiy Commercial Construction provides these preconstruction services for tenant improvements and commercial remodels across San Diego County, so the budget, the schedule and the permit path are known before you commit to building.
- What we buildA budget, drawings, a permit, a schedule
- WhereSan Diego County
- LicenseCSLB B General Building #922807
- How we workDesign, permit and construction, one contract
Preconstruction
A wall costs almost nothing to move while it is still a line on paper.
Every commercial project has a few facts that decide its cost: how much power the building has, where a drain can go, what the landlord allows, how long the equipment takes to arrive. Preconstruction is where those facts are found.
Found early, each one is a line in the budget. Found late, each one is a stopped job.
What you get
What you hold at the end of it.
Six documents. Together they are the decision to build or not.
- 01
A written scope
What will be built, room by room, in plain words, and what is left out.
- 02
A budget by trade
One line for each trade, with allowances named as allowances.
- 03
Drawings
The plan, and the engineering where the work calls for it, ready for the building department.
- 04
The permit path
Which office has the address, which reviews apply, and what else has to be approved.
- 05
A schedule
Design, permit, ordering, construction and inspections on one calendar.
- 06
A list of risks
What is still unknown, what it could cost, and when it will be known.
Why it pays
The same problem, found early and found late.
Five things that turn up on most commercial projects.
| Found in preconstruction | Found during construction | |
|---|---|---|
| The electrical service is too small | A line in the budget and an early application to the utility. | A stopped job while the utility schedules the upgrade. |
| A drain cannot go where the plan shows | The plan changes before anyone builds from it. | Concrete cut twice, and a layout that no longer fits. |
| A landlord rule nobody read | Working hours and approvals are in the schedule. | Work stopped by the building manager, or moved to nights. |
| Equipment that takes a long time to arrive | Ordered while the permit is in review. | A finished room waiting for its equipment. |
| Accessibility upgrades | Priced with the rest of the job. | A correction at the final inspection. |
The budget
Three budgets, each tighter than the last.
A number is only as good as the drawing behind it. So the budget is given three times, and each time it rests on more.
- 01
After the site walk
A range, from the space as it stands and your list of needs. Enough to decide whether the project makes sense.
- 02
After the layout
A budget by trade, from a drawn plan. Enough to choose between options.
- 03
After the permit drawings
A fixed price, from finished drawings and subcontractor bids. This is the number in the contract.
Leasing a space
What to check before you sign the lease.
A walk-through with a builder answers most of these in an hour.
The kinds of shell a landlord hands over are on the tenant improvement page. Cold shell, warm shell and second generation. Leasing a warehouse has its own list.
Power
Whether the electrical service can carry your equipment, and what it takes to enlarge it.
Drains
Where plumbing can go. On a concrete slab, that decides where sinks and restrooms can be.
Heating and cooling
The age and size of the units, and whether you or the landlord pays to replace them.
Restrooms
Whether there are enough for your headcount, and whether they are accessible.
Sprinklers and alarm
Whether the building has them, and what your layout does to them.
What the landlord delivers
The condition the lease promises, in writing, and the allowance that goes with it.
Earlier work
Whether what is there was built with permits. Unpermitted work becomes the next tenant's problem.
Questions
Preconstruction questions.
What is preconstruction?
Preconstruction is everything that happens before construction starts: walking the space, setting the scope, pricing it, drawing it and getting the permit. Its purpose is to find the expensive surprises while they are still lines on paper.
When should preconstruction start?
Before the lease is signed if you can, and no later than the day it is. What a space costs to build out depends on its power, its plumbing, its air conditioning and its restrooms, and a walk-through shows most of that.
Is the first budget a fixed price?
No. The first budget is a range, based on the space and your list of needs. It tightens as the plan is drawn, and it becomes a fixed price when the permit drawings are finished and the subcontractors have bid on them.
Can you work with our architect?
Yes. If you already have an architect or a designer, we price their drawings as they develop and say early when something will not fit the budget. If you do not, our designers draw the plan.
What do you need from us to start?
The lease or its work letter, the landlord's building rules, any drawings of the space, your list of rooms and equipment, and the date you need to open. Then we walk the space with you.
Start here
Request a site walk in San Diego County.
Tell us about the space. We will call to set a time to walk it with you.
Office12396 World Trade Dr, Suite 106A
San Diego, CA 92128
Phone(858) 371-3839
HoursMonday to Friday, 8:00 AM to 4:30 PM