The commercial construction process, step by step.

The commercial construction process has five phases: preconstruction, design, permitting, construction and closeout. Inside the construction phase the work follows a fixed order, from demolition and framing through rough-in, inspections, finishes and the final sign-off. This guide walks through each one for a tenant improvement or a remodel.

The whole project

Five phases, and what ends each one.

A phase is over when it has produced something the next one can start from.

  1. 01

    Preconstruction

    Ends with a scope, a budget and a schedule you agree to.

  2. 02

    Design

    Ends with drawings complete enough to permit and to price.

  3. 03

    Permitting

    Ends when the building department issues the permit.

  4. 04

    Construction

    Ends with the final inspection passed.

  5. 05

    Closeout

    Ends when the punch list is done and the documents are handed over.

On site

The order of work, and why it cannot change.

Each trade covers the work of the one before it. That is why the order is fixed, and why a late decision costs more the later it comes.

  1. 01

    Protection and setup

    Floors, elevators and neighbors are protected. Dust barriers go up.

  2. 02

    Demolition

    What is leaving comes out. Hidden conditions show themselves here.

  3. 03

    Slab work

    Trenches for new drains and floor power are cut, piped and poured back.

  4. 04

    Framing

    Walls and ceilings are framed. The plan becomes visible for the first time.

  5. 05

    Rough-in

    Pipes, ducts, wires and sprinkler lines go into the walls and above the ceilings.

  6. 06

    Rough inspections

    The inspector checks everything that is about to be covered.

  7. 07

    Insulation and drywall

    Walls are closed, taped and finished.

  8. 08

    Ceilings, paint and flooring

    The finishes go on, cleanest trade last.

  9. 09

    Fixtures and equipment

    Lights, plumbing fixtures, cabinets, doors, hardware and equipment are set.

  10. 10

    Final inspections

    Each trade is signed off, then the building inspector closes the permit.

Your part

Your decisions, in the order they are needed.

Most delays on a commercial project start with a decision that came late.

Needed byWhy
The layoutBefore the permit drawings.Moving a wall afterward means a revision at the building department.
EquipmentBefore rough-in.Every drain, outlet and vent is placed for a specific piece of equipment.
FinishesBefore ordering.Some flooring, tile and lighting takes a long time to arrive.
Data and security vendorsBefore the ceilings close.Their cabling runs above the ceiling and inside the walls.
FurnitureBefore the final inspection is scheduled.Deliveries and installers need the space finished, and you need time before opening.

The last phase

What closeout hands over.

A project is finished when the paperwork is, not when the last tool leaves.

  • The punch list

    Every small item still open, written down and checked off.

  • The signed-off permit

    And the certificate of occupancy, where the use is new.

  • Record drawings

    The drawings updated to show what was actually built.

  • Warranties and manuals

    For the equipment and materials installed.

  • The landlord's package

    The closeout documents your landlord and your insurer ask for.

What goes wrong

Six things that slow a project down.

Preconstruction exists to find these before they cost time.

  1. 01

    Late decisions

    A finish or a piece of equipment chosen after the trade that needed it has left.

  2. 02

    Changes after the permit

    A change to the plan can mean a new review by the building department.

  3. 03

    Long lead times

    Electrical gear, doors, glass and equipment ordered too late.

  4. 04

    Hidden conditions

    What demolition uncovers: old wiring, an unrecorded pipe, a slab thinner than the drawings say.

  5. 05

    Failed inspections

    Work covered before it was inspected has to be opened again.

  6. 06

    Building rules

    Working hours, elevator bookings and noise limits that were not in the schedule.

Questions

Construction process questions.

What are the phases of a commercial construction project?

Five: preconstruction, design, permitting, construction and closeout. Preconstruction sets the scope and the budget. Design produces the drawings. Permitting gets them approved. Construction builds them. Closeout hands over the finished space and its documents.

What is rough-in?

Rough-in is the stage when pipes, ducts, wires and sprinkler lines are installed inside the walls and above the ceilings, before anything is covered. An inspector checks this work while it can still be seen.

What is a punch list?

A punch list is the written list of small items still to finish or correct when the work is substantially done: a scratched door, a missing cover plate, a paint touch-up. The project is complete when every item is checked off.

What is a change order?

A change order is a written change to the contract: what is being added, removed or altered, what it costs and what it does to the schedule. It is signed before the changed work is done.

How long does a tenant improvement take?

It depends on the size of the space, the permit, and how long the slowest material or piece of equipment takes to arrive. The construction itself is often the shortest part. You get a schedule for your project in preconstruction, before you commit to building.

Start here

Request a site walk in San Diego County.

Tell us about the space. We will call to set a time to walk it with you.

Office12396 World Trade Dr, Suite 106A
San Diego, CA 92128

Phone(858) 371-3839

HoursMonday to Friday, 8:00 AM to 4:30 PM

By providing your number and clicking “Request a site walk”, you agree to be contacted by Kaminskiy Commercial Construction about your project via phone, email, and text messages, including marketing messages about special offers, discounts, and promotions. Consent is not a condition of purchase. Message and data rates may apply. You can unsubscribe at any time by replying STOP. For help, reply HELP. Message frequency will vary.